Posts Tagged ‘Equipment’

Purification System

Their action is based on the work of the useful microorganisms that mineralize organic matter from liquid waste by recycling them into inorganic. These bacteria originally present in the wastewater, but can be loaded into the system and cleaning purpose. Under natural conditions, the process of assimilation of organic matter by microorganisms in the soil and flows into reservoirs. In soil, it is basically without oxygen (anaerobic process). Due to the acid, and subsequently methane fermentation proteins, fats and carbohydrates are decomposed to simple inorganic compounds. In water aerobic mineralization, it takes place in the presence of oxygen. In this case, the bacteria form a community of activated sludge, which absorbs and oxidizes organic matter from wastewater. Purification system, based on the capacity of the soil and natural waters to oxidize organic matter to inorganic compounds, is absorbed by plants, are called natural.

These include a field of filtration and bio-ponds. In the first case of domestic liquid wastes are distributed in areas of permeable soil and cleaned by filtering through the soil. Bioponds arranged for the final purification of sewage but only in the warm season. The lower the temperature of water in a reservoir, the slower are processes of biological oxidation. Artificial treatment systems use the same processes that occur in natural conditions, but many times intensified. At the expense of creating the best conditions for the realization aerobic or anaerobic treatment processes there is a lot faster. In fact, any local wastewater treatment plant (LOS) is a revised and modified version of the bio-ponds or fields of filtration, enclosed in a compact and easy-to-use shell.

The Exact

Brick hard enough warming, this may adversely affect the structure. The exact temperature of the heating point difficult, but the bush lilac that is growing in me for such a fire burns on a regular basis, despite the fire brick inside. But on the other hand do alpine slide, for example, nothing prevents. Fundam. ghts. Since the building will have no a lot of weight, then this would be enough for the fireplace 20 cm reinforced concrete grade 100. In order to make the foundation run the following steps: Make a layout with the help of ropes and pegs. Digging a hole in perimeter of the basement (with a margin of about 5 cm in width) and a depth of 30 cm on the bottom of the pit pour a layer of slag and rammed it. This layer will be a kind of cushion under the foundation.

Make a mold. To do this, bring down from the boards boards width of 30 cm, and accordingly the length of the longest sides of the foundation. Shields set around the perimeter of the foundation of the future. Puts the inside casing metal. If there are old pieces of iron are not needed (any) they are quite fit here.

If not – Make a reinforcing frame of the 10th fittings, welded together. Ready-mixed concrete from such a calculation as to obtain approximately 100 mark. Fill in the concrete formwork. The foundation is ready. Let him stand for 3 days and after that we can proceed to construction.

Archives